Coastal roots
Pekan Batu Maung, the fishing jetty and the established kampungs are still the centre of daily life here — not a footnote to Southbay.
Where the island meets its second bridge
Batu Maung is where Penang Island runs out of land and the Second Bridge begins — a fishing town, an industrial corridor, a new coastline, and now some of the island's most active residential ground. Understand the place before you shortlist the project.
Written and maintained by Kevin Lee, REN 14973, FLP Realty Sdn Bhd. Distances come from the developer's own amenities sheet; the measurement method is not stated by the source.
It is not shorthand for a condo cluster. Batu Maung is a working coastal district with a fishing town at its centre, kampung neighbourhoods inland, the Southbay development area to the north, and the island landing of the Penang Second Bridge on its eastern shore.
Batu Maung is a coastal district at the south-eastern tip of Penang Island. It sits between the Bayan Lepas industrial corridor, the Southbay development area and the reclamation now under way off its eastern shore — which is why it appears in almost every conversation about where Penang Island grows next.
| Position | South-eastern tip of Penang Island |
|---|---|
| Coordinates | 5.28491 N, 100.2875 E |
| Origin | A former deep-sea fishing village |
| Nearest crossing | Penang Second Bridge, 0.9 km |
The useful picture is not “near everything”. It is a specific mix of coast, industry, road infrastructure and long-term change — and each one cuts both ways.
Pekan Batu Maung, the fishing jetty and the established kampungs are still the centre of daily life here — not a footnote to Southbay.
Bayan Lepas Free Industrial Zone is 0.9 km away. It shapes commuting patterns, rental demand and the character of the inland roads.
The Penang Second Bridge opened in 2014, 0.9 km from here, and permanently changed this district's relationship with Batu Kawan and the mainland.
The LRT Mutiara Line and Silicon Island are still lifecycle-sensitive stories. They are not finished benefits, and should not be priced in as though they were.
LRT Mutiara Line. 29.5 km, 21 stations, Komtar to Permatang Damar Laut; construction began January 2026; operations targeted December 2031. Proposed — verify current status
Silicon Island. Reclamation under way, about 133.5 ha as at March 2026; Phase One 513.95 ha targeted 2031. As at March 2026; may have changed
Batu Maung's case has always been access rather than centrality. Here is what is actually near it, taken from the developer's own amenities sheet.
from the developer's Nearby Amenities sheet (Sales Kit p.16, 2026). Measurement method not stated by the source; treat as approximate. Verify with your own routing app.
No travel times are published on this site. The source states a distance and no measurement method. Converting that into a journey time would be inventing a figure, so we do not.
Southern Penang Island is car-dependent. What matters is not how many amenities exist but how far each one is — so the whole set is listed with its distance.
from the developer's Nearby Amenities sheet (Sales Kit p.16, 2026). Measurement method not stated by the source; treat as approximate. Verify with your own routing app. Source: M-Amaya-Sales-Kit.pdf p.16 'Nearby Amenities' (2026).
Batu Maung's residential demand is not driven by George Town. It is driven by the electronics and manufacturing corridor immediately north of it, and by what is being reclaimed to its east.
Penang's electronics manufacturing corridor sits close enough that Batu Maung functions as commuter housing for it. The developer of M Amaya names professionals in multinationals among its stated target buyers.
Attributed to the developer's own positioning, Sales Kit p.13. It is their assessment of the market, not ours.
Reclamation under way, about 133.5 ha as at March 2026; Phase One 513.95 ha targeted 2031. As at March 2026; may have changed
This is the single biggest open question for the area. It is a reclamation programme with a long horizon, not a delivered amenity, and the honest position is that nobody can tell you today what it will be worth to a home here.
A freehold development of 833 serviced apartments in two 37-storey towers on 4.8 acres — designed around a Japanese spatial language its architects call Kumiko: crafted geometry that filters light, frames views and gives the towers their signature facade.
| Developer | Vienna View Development Sdn Bhd (728448-H), a wholly-owned subsidiary of Mah Sing Group Berhad (230149-P) |
|---|---|
| Architect | East Design Architect Sdn Bhd |
| Tenure | Freehold |
| Land area | 4.8 acres |
| Components | 2 towers of serviced apartments, 37 storeys, plus 11 commercial shop lots |
| Total units | 833 |
| Completion | 2030 Proposed — verify current status |
| Green rating | GreenRE Gold (Provisional) |
The lattice breaking up the facade is the project's own motif — a traditional Japanese joinery geometry reinterpreted as architecture. The same geometry names the Kumiko Cabana on the pool deck, the Kumiko Pavilion, the Kumiko Floating Deck on Level 9 and the Kumiko Islands Secret Garden.
Sizes run from 721 to 1,432 sq ft. Each price below is the type's range from the owner-supplied package, never a unit-specific quote.
* Nett price to purchaser after the current 10% rebate and early-bird conversion incentive, per the owner-supplied package dated 2026-08-23. subject to current availability, subject to change without prior notice.
Both bases are published side by side: the SPA price as issued, and the nett price to purchaser after the current packages — exactly as stated in the owner-supplied package dated 2026-08-23.
| Type | Built-up | Layout | SPA price range | Nett to purchaser* | Nett RM psf |
|---|---|---|---|---|---|
| Type A | 721 sq ft | 1 bedroom + 1 study | RM565,800 – RM570,800 | RM489,220 – RM493,720 | 679–685 |
| Type B | 990 sq ft | 3 bedrooms | RM764,800 – RM772,800 | RM644,320 – RM660,520 | 651–667 |
| Type C | 1,211 sq ft | 4 bedrooms | RM924,800 – RM959,800 | RM802,320 – RM833,820 | 663–689 |
| Type D | 1,432 sq ft | 4 bedrooms | RM1,054,800 – RM1,059,800 | RM919,320 – RM923,820 | 642–645 |
| Type E | 1,335 sq ft | 4 bedrooms | RM994,800 – RM999,800 | RM865,320 – RM869,820 | 648–652 |
| * Nett = SPA price less the 10% rebate and the early-bird conversion incentive for that type. subject to current availability; subject to unit selection; subject to developer confirmation; subject to change without prior notice. | |||||
Each type has its own page with a large plan, a room-by-room schedule taken exactly as the plan draws it, and an honest note on what the layout trades away.
The key plan shows where each type sits on a typical floor. The same type letter appears in more than one stack position, which is why this site publishes no facing or view claim at type level — the developer's own plan shows it would not be true.
Orientation labels on the key plan run Southbay Plaza and sea view to the north, sea view to the east, garden view to the west, and mountain and sea view to the south.
The Level 8 podium carries 41 numbered facilities — the infinity pool, the onsen jacuzzi, the Kumiko cabanas, a pickleball-ready hall — with the Elevated Zen Garden and Seaview Lounge one level above.
Registered real-estate negotiator, answering every enquiry on this site personally — there is no call centre and no lead pool behind this page.
Ask in English, Chinese or Bahasa Malaysia. Questions about a specific unit, the current packages, financing scenarios or how M Amaya compares — all fine. A question costs nothing and creates no obligation.
Prefer to verify first? See Kevin Lee's Google Business Profile — a profile page, not an enquiry channel.
South-eastern tip of Penang Island, at 5.28491 N, 100.2875 E. It sits south of Bayan Lepas and holds the island landing of the Penang Second Bridge.
Komtar, in central George Town, is 17 km away on the developer's amenities sheet. No travel time is published here: the source states a distance and no measurement method, and turning one into the other would be inventing a figure.
29.5 km, 21 stations, Komtar to Permatang Damar Laut; construction began January 2026; operations targeted December 2031. The nearest proposed station, S02 Permatang Damar Laut, is 4.6 km from the M Amaya site. Treat it as a proposal with a long horizon, not a delivered benefit.
Reclamation under way, about 133.5 ha as at March 2026; Phase One 513.95 ha targeted 2031. It lies 4 km from here. It is a reclamation programme, not a completed district, and the honest answer is that its effect on residential values here is not yet knowable.
This site covers M Amaya in Southbay in depth: 833 freehold serviced apartments in two 37-storey towers, nett from RM489,220* after current packages. See the project pages.
Whether M Amaya fits, how the packages work, what the area is like at 7 pm on a weekday — ask directly. No form, no call centre; the number below reaches Kevin Lee.
View Kevin Lee on Google — the Google Business Profile for Kevin Lee, if you want to check who you are dealing with before you get in touch. It is a profile page, not an enquiry channel.
Prefer to type the number yourself? It is +6013-3398686
Facts on this page were last verified on 2026-08-23. Every figure traces to a dated source listed on our sources page.